JJM PWS Scheme analysis as per different stages of work
Format PM-18
SNo State/ UT Total Schemes# Number of schemes
Physically completed Scheme commissioned Financially completed Scheme not physically completed
Total Civil work not yet completed Civil work completed but awaiting electrification Civil work and electrification completed, but trial run pending Civil work, electrification, and trial run completed
A B C D (Out Of C) E (Out Of C) F= (G + H + I + J) G H I J
Total 638550 362656 220398 87764 275894 224581 8585 15744 26984
1 Andaman & Nicobar Islands 40 25 24 24 15 11 0 4 0
2 Andhra Pradesh 76068 14412 7445 1200 61656 55773 117 906 4860
3 Arunachal Pradesh 7152 6626 5044 4727 526 294 0 220 12
4 Assam 96006 81430 72085 27161 14576 13028 114 985 449
5 Bihar 304 302 300 301 2 2 0 0 0
6 Chhattisgarh 32215 14739 5210 122 17476 16478 332 185 481
7 Goa 256 256 244 243 0 0 0 0 0
8 Gujarat 585 371 318 305 214 51 2 161 0
9 Haryana 6558 5965 5081 3495 593 538 5 21 29
10 Himachal Pradesh 1747 1069 714 651 678 533 10 113 22
11 Jammu & Kashmir 3361 1302 732 20 2059 1783 34 228 14
12 Jharkhand 97535 61508 28297 952 36027 35101 64 276 586
13 Karnataka 66318 27695 18482 9326 38623 21065 1384 3440 12734
14 Kerala 1730 271 126 43 1459 1225 9 212 13
15 Ladakh 414 265 241 0 149 143 0 6 0
16 Lakshadweep 10 4 0 0 6 5 0 1 0
17 Madhya Pradesh 45111 31232 15448 3301 13879 10864 1464 1217 334
18 Maharashtra 51558 24837 11961 6933 26721 18157 1492 3706 3366
19 Manipur 1266 524 13 15 742 453 5 241 43
20 Meghalaya 7790 5429 1240 538 2361 1595 57 583 126
21 Mizoram 852 845 694 474 7 5 0 2 0
22 Nagaland 1408 1037 875 841 371 150 16 41 164
23 Odisha 15377 8633 6860 1848 6744 5864 160 165 555
24 Puducherry 91 26 0 0 65 65 0 0 0
25 Punjab 2307 2205 2104 1943 102 87 0 4 11
26 Rajasthan 11621 4323 2211 1174 7298 4729 1607 567 395
27 Sikkim 1791 1187 355 58 604 48 0 527 29
28 Tamil Nadu 21432 20869 16742 12168 563 471 72 16 4
29 Tripura 19637 9980 6246 2656 9657 8244 346 157 910
30 Uttar Pradesh 40955 18773 1887 227 22182 18177 1278 1034 1693
31 Uttarakhand 16555 15529 9024 6615 1026 554 2 432 38
32 West Bengal 10500 987 395 403 9513 9088 15 294 116
Total 638550 362656 220398 87764 275894 224581 8585 15744 26984
Note :
(1). Civil Work Completed: All structural components (intake structures, pump houses, treatment plants, service reservoirs, pipelines, etc.) are constructed and ready for equipment installation. Marked complete in JJM-IMIS.
(2). Electrified: Electrical infrastructure (power supply system, wiring, electrical panels) is installed for operating pumps, motors, and other components. Marked complete in JJM-IMIS. Not required for gravity-based schemes.
(3). Trial Run Completed: All equipment and machinery installed, and a trial run conducted to ensure proper functioning. System operates as intended. Marked complete in JJM-IMIS.
(4). Physically Completed : Entire water supply system (civil, electrical, mechanical works) is fully completed, operational, and ready for commissioning. Approved by the State Authority. Marked complete in IMIS.
(5). Scheme Commissioned: Water supply system is fully operational, meets design specifications, and performance standards. Ready for handover. Marked complete in JJM-IMIS with the commissioning date entered in IMIS.
(6). Financially Completed: All financial obligations related to the project are fulfilled. Marked complete in IMIS.
(7). # Only ongoing and completed JJM PWS schemes are counted here:.



×