JJM PWS Scheme analysis as per different stages of work
Format PM-18
SNo State/ UT Total Schemes# Number of schemes
Physically completed Scheme commissioned Financially completed Scheme not physically completed
Total Civil work not yet completed Civil work completed but awaiting electrification Civil work and electrification completed, but trial run pending Civil work, electrification, and trial run completed
A B C D (Out Of C) E (Out Of C) F= (G + H + I + J) G H I J
Total 638550 319422 202615 85632 319128 283237 5198 14855 15838
1 Andaman & Nicobar Islands 40 25 24 24 15 11 0 4 0
2 Andhra Pradesh 76068 14412 7420 1199 61656 59736 4 365 1551
3 Arunachal Pradesh 7152 6626 5044 4727 526 294 0 220 12
4 Assam 96006 78948 71209 27161 17058 14758 54 1102 1144
5 Bihar 304 302 300 301 2 2 0 0 0
6 Chhattisgarh 32215 10167 4047 122 22048 21589 37 188 234
7 Goa 256 256 244 243 0 0 0 0 0
8 Gujarat 585 349 268 161 236 53 2 181 0
9 Haryana 6558 5965 5061 3495 593 562 5 21 5
10 Himachal Pradesh 1747 1068 714 650 679 555 8 102 14
11 Jammu & Kashmir 3361 1247 733 20 2114 2031 1 78 4
12 Jharkhand 97535 56386 22517 951 41149 40214 62 258 615
13 Karnataka 66318 24888 15925 9325 41430 32103 556 2913 5858
14 Kerala 1730 266 126 43 1464 1229 9 211 15
15 Ladakh 414 243 241 0 171 164 0 6 1
16 Lakshadweep 10 4 0 0 6 5 0 1 0
17 Madhya Pradesh 45111 22203 13438 3137 22908 20729 621 1190 368
18 Maharashtra 51558 23444 9287 6284 28114 19893 1531 3893 2797
19 Manipur 1266 519 13 15 747 459 5 242 41
20 Meghalaya 7790 3680 977 435 4110 3289 17 665 139
21 Mizoram 852 842 694 474 10 7 0 3 0
22 Nagaland 1408 945 855 840 463 419 1 12 31
23 Odisha 15377 8318 6787 1630 7059 6391 169 167 332
24 Puducherry 91 26 0 0 65 65 0 0 0
25 Punjab 2307 2200 2078 1863 107 95 4 4 4
26 Rajasthan 11621 3071 2067 1006 8550 8019 141 258 132
27 Sikkim 1791 1187 354 58 604 48 0 528 28
28 Tamil Nadu 21432 16910 15829 12148 4522 4489 4 23 6
29 Tripura 19637 8269 6035 2448 11368 10861 197 157 153
30 Uttar Pradesh 40955 10281 1028 150 30674 25399 1753 1303 2219
31 Uttarakhand 16555 15441 8999 6590 1114 624 2 469 19
32 West Bengal 10500 934 301 132 9566 9144 15 291 116
Total 638550 319422 202615 85632 319128 283237 5198 14855 15838
Note :
(1). Civil Work Completed: All structural components (intake structures, pump houses, treatment plants, service reservoirs, pipelines, etc.) are constructed and ready for equipment installation. Marked complete in JJM-IMIS.
(2). Electrified: Electrical infrastructure (power supply system, wiring, electrical panels) is installed for operating pumps, motors, and other components. Marked complete in JJM-IMIS. Not required for gravity-based schemes.
(3). Trial Run Completed: All equipment and machinery installed, and a trial run conducted to ensure proper functioning. System operates as intended. Marked complete in JJM-IMIS.
(4). Physically Completed : Entire water supply system (civil, electrical, mechanical works) is fully completed, operational, and ready for commissioning. Approved by the State Authority. Marked complete in IMIS.
(5). Scheme Commissioned: Water supply system is fully operational, meets design specifications, and performance standards. Ready for handover. Marked complete in JJM-IMIS with the commissioning date entered in IMIS.
(6). Financially Completed: All financial obligations related to the project are fulfilled. Marked complete in IMIS.
(7). # Only ongoing and completed JJM PWS schemes are counted here:.



×
Report header
Column description :