JJM PWS Scheme analysis as per different stages of work
Format PM-18
SNo State/ UT Total Schemes# Number of schemes
Physically completed Scheme commissioned Financially completed Scheme not physically completed
Total Civil work not yet completed Civil work completed but awaiting electrification Civil work and electrification completed, but trial run pending Civil work, electrification, and trial run completed
A B C D (Out Of C) E (Out Of C) F= (G + H + I + J) G H I J
Total 638550 298840 195420 83729 339710 302256 4662 14374 18418
1 Andaman & Nicobar Islands 40 25 24 24 15 11 0 4 0
2 Andhra Pradesh 76068 13321 6763 548 62747 62133 4 377 233
3 Arunachal Pradesh 7152 6612 4985 4709 540 298 0 231 11
4 Assam 96006 78948 71205 27161 17058 14938 55 1113 952
5 Bihar 304 302 300 301 2 2 0 0 0
6 Chhattisgarh 32215 10031 3819 115 22184 21957 29 187 11
7 Goa 256 256 244 243 0 0 0 0 0
8 Gujarat 585 349 268 161 236 53 2 181 0
9 Haryana 6558 5905 5029 3418 653 627 0 22 4
10 Himachal Pradesh 1747 810 676 636 937 789 8 115 25
11 Jammu & Kashmir 3361 1238 733 20 2123 2040 2 78 3
12 Jharkhand 97535 53607 20040 913 43928 43446 41 247 194
13 Karnataka 66318 23345 14956 9311 42973 39461 17 1464 2031
14 Kerala 1730 235 122 37 1495 1260 9 215 11
15 Ladakh 414 243 241 0 171 165 0 6 0
16 Lakshadweep 10 4 0 0 6 5 0 1 0
17 Madhya Pradesh 45111 20927 13080 3092 24184 21862 634 1248 440
18 Maharashtra 51558 13793 7917 6096 37765 21026 1584 4119 11036
19 Manipur 1266 517 13 15 749 461 5 242 41
20 Meghalaya 7790 2719 731 384 5071 3568 46 1198 259
21 Mizoram 852 842 694 474 10 10 0 0 0
22 Nagaland 1408 931 827 823 477 461 1 13 2
23 Odisha 15377 8163 6751 1614 7214 6563 170 169 312
24 Puducherry 91 26 0 0 65 65 0 0 0
25 Punjab 2307 2200 2070 1863 107 95 4 4 4
26 Rajasthan 11621 2913 2010 885 8708 8322 25 237 124
27 Sikkim 1791 1187 334 58 604 48 0 534 22
28 Tamil Nadu 21432 16338 15552 11662 5094 5062 0 30 2
29 Tripura 19637 7872 6013 2431 11765 11249 163 191 162
30 Uttar Pradesh 40955 8907 843 150 32048 26351 1849 1397 2451
31 Uttarakhand 16555 15342 8913 6475 1213 683 1 506 23
32 West Bengal 10500 932 267 110 9568 9245 13 245 65
Total 638550 298840 195420 83729 339710 302256 4662 14374 18418
Note :
(1). Civil Work Completed: All structural components (intake structures, pump houses, treatment plants, service reservoirs, pipelines, etc.) are constructed and ready for equipment installation. Marked complete in JJM-IMIS.
(2). Electrified: Electrical infrastructure (power supply system, wiring, electrical panels) is installed for operating pumps, motors, and other components. Marked complete in JJM-IMIS. Not required for gravity-based schemes.
(3). Trial Run Completed: All equipment and machinery installed, and a trial run conducted to ensure proper functioning. System operates as intended. Marked complete in JJM-IMIS.
(4). Physically Completed : Entire water supply system (civil, electrical, mechanical works) is fully completed, operational, and ready for commissioning. Approved by the State Authority. Marked complete in IMIS.
(5). Scheme Commissioned: Water supply system is fully operational, meets design specifications, and performance standards. Ready for handover. Marked complete in JJM-IMIS with the commissioning date entered in IMIS.
(6). Financially Completed: All financial obligations related to the project are fulfilled. Marked complete in IMIS.
(7). # Only ongoing and completed JJM PWS schemes are counted here:.



×