JJM PWS Scheme analysis as per different stages of work
Format PM-18
SNo State/ UT Total Schemes# Number of schemes
Physically completed Scheme commissioned Financially completed Scheme not physically completed
Total Civil work not yet completed Civil work completed but awaiting electrification Civil work and electrification completed, but trial run pending Civil work, electrification, and trial run completed
A B C D (Out Of C) E (Out Of C) F= (G + H + I + J) G H I J
Total 638550 411149 263524 115737 227401 193034 7209 13765 13393
1 Andaman & Nicobar Islands 40 25 24 24 15 10 0 4 1
2 Andhra Pradesh 76068 21286 8228 2507 54782 52586 92 872 1232
3 Arunachal Pradesh 7152 6697 5290 5249 455 237 0 207 11
4 Assam 96006 82414 73256 29305 13592 12201 127 954 310
5 Bihar 304 302 300 301 2 2 0 0 0
6 Chhattisgarh 32215 16441 6280 122 15774 14837 311 186 440
7 Goa 256 256 244 243 0 0 0 0 0
8 Gujarat 585 371 319 308 214 50 2 161 1
9 Haryana 6558 6197 5341 3689 361 335 0 9 17
10 Himachal Pradesh 1747 1139 821 808 608 430 17 120 41
11 Jammu & Kashmir 3361 1474 732 20 1887 1454 58 366 9
12 Jharkhand 97535 67996 34445 2672 29539 28642 75 263 559
13 Karnataka 66318 49677 31621 25323 16641 10492 700 1988 3461
14 Kerala 1730 440 126 44 1290 1060 9 207 14
15 Ladakh 414 364 277 57 50 44 1 4 1
16 Lakshadweep 10 4 1 0 6 5 0 1 0
17 Madhya Pradesh 45111 33216 16875 3312 11895 9379 1277 951 288
18 Maharashtra 51558 25476 12525 7073 26082 17663 1509 3567 3343
19 Manipur 1266 549 67 61 717 434 5 236 42
20 Meghalaya 7790 6228 2512 1687 1562 797 49 592 124
21 Mizoram 852 852 768 478 0 0 0 0 0
22 Nagaland 1408 1194 966 873 214 135 9 36 34
23 Odisha 15377 9699 7945 4851 5678 4788 129 109 652
24 Puducherry 91 26 0 0 65 65 0 0 0
25 Punjab 2307 2216 2113 1989 91 75 0 3 13
26 Rajasthan 11621 5087 2708 1644 6534 4203 1392 572 367
27 Sikkim 1791 1187 359 58 604 48 0 525 31
28 Tamil Nadu 21432 21371 18846 12666 61 56 0 3 2
29 Tripura 19637 12384 11472 2727 7253 6298 204 114 637
30 Uttar Pradesh 40955 19857 9520 419 21098 17246 1227 1000 1625
31 Uttarakhand 16555 15588 9066 6660 967 520 2 422 23
32 West Bengal 10500 1136 477 567 9364 8942 14 293 115
Total 638550 411149 263524 115737 227401 193034 7209 13765 13393
Note :
(1). Civil Work Completed: All structural components (intake structures, pump houses, treatment plants, service reservoirs, pipelines, etc.) are constructed and ready for equipment installation. Marked complete in JJM-IMIS.
(2). Electrified: Electrical infrastructure (power supply system, wiring, electrical panels) is installed for operating pumps, motors, and other components. Marked complete in JJM-IMIS. Not required for gravity-based schemes.
(3). Trial Run Completed: All equipment and machinery installed, and a trial run conducted to ensure proper functioning. System operates as intended. Marked complete in JJM-IMIS.
(4). Physically Completed : Entire water supply system (civil, electrical, mechanical works) is fully completed, operational, and ready for commissioning. Approved by the State Authority. Marked complete in IMIS.
(5). Scheme Commissioned: Water supply system is fully operational, meets design specifications, and performance standards. Ready for handover. Marked complete in JJM-IMIS with the commissioning date entered in IMIS.
(6). Financially Completed: All financial obligations related to the project are fulfilled. Marked complete in IMIS.
(7). # Only ongoing and completed JJM PWS schemes are counted here:.



×
Report header
Column description :