JJM PWS Scheme analysis as per different stages of work
Format PM-18
SNo State/ UT Total Schemes# Number of schemes
Physically completed Scheme commissioned Financially completed Scheme not physically completed
Total Civil work not yet completed Civil work completed but awaiting electrification Civil work and electrification completed, but trial run pending Civil work, electrification, and trial run completed
A B C D (Out Of C) E (Out Of C) F= (G + H + I + J) G H I J
Total 638550 368418 223165 91565 270132 221391 8562 15716 24463
1 Andaman & Nicobar Islands 40 25 24 24 15 11 0 4 0
2 Andhra Pradesh 76068 14412 7445 1200 61656 55773 117 906 4860
3 Arunachal Pradesh 7152 6626 5044 4727 526 294 0 220 12
4 Assam 96006 81575 72148 27161 14431 12945 113 951 422
5 Bihar 304 302 300 301 2 2 0 0 0
6 Chhattisgarh 32215 14802 5219 122 17413 16295 332 184 602
7 Goa 256 256 244 243 0 0 0 0 0
8 Gujarat 585 371 318 305 214 51 2 161 0
9 Haryana 6558 6183 5120 3528 375 353 5 12 5
10 Himachal Pradesh 1747 1069 714 651 678 533 10 113 22
11 Jammu & Kashmir 3361 1447 732 20 1914 1459 58 367 30
12 Jharkhand 97535 62137 28584 952 35398 34470 64 274 590
13 Karnataka 66318 31124 19720 12024 35194 20160 1410 3419 10205
14 Kerala 1730 272 126 43 1458 1224 9 212 13
15 Ladakh 414 361 256 57 53 47 1 4 1
16 Lakshadweep 10 4 0 0 6 5 0 1 0
17 Madhya Pradesh 45111 31433 15454 3301 13678 10690 1457 1201 330
18 Maharashtra 51558 25049 12130 7005 26509 18048 1494 3641 3326
19 Manipur 1266 524 18 20 742 453 5 241 43
20 Meghalaya 7790 5441 1301 608 2349 1594 55 576 124
21 Mizoram 852 845 694 474 7 5 0 2 0
22 Nagaland 1408 1178 901 872 230 141 11 37 41
23 Odisha 15377 8817 7187 2234 6560 5630 154 160 616
24 Puducherry 91 26 0 0 65 65 0 0 0
25 Punjab 2307 2205 2104 1952 102 87 0 4 11
26 Rajasthan 11621 4418 2243 1236 7203 4643 1590 567 403
27 Sikkim 1791 1187 355 58 604 48 0 527 29
28 Tamil Nadu 21432 21011 17211 12327 421 378 28 11 4
29 Tripura 19637 9980 6246 2656 9657 8237 352 157 911
30 Uttar Pradesh 40955 18778 1891 419 22177 18135 1278 1038 1726
31 Uttarakhand 16555 15546 9026 6616 1009 554 2 432 21
32 West Bengal 10500 1014 410 429 9486 9061 15 294 116
Total 638550 368418 223165 91565 270132 221391 8562 15716 24463
Note :
(1). Civil Work Completed: All structural components (intake structures, pump houses, treatment plants, service reservoirs, pipelines, etc.) are constructed and ready for equipment installation. Marked complete in JJM-IMIS.
(2). Electrified: Electrical infrastructure (power supply system, wiring, electrical panels) is installed for operating pumps, motors, and other components. Marked complete in JJM-IMIS. Not required for gravity-based schemes.
(3). Trial Run Completed: All equipment and machinery installed, and a trial run conducted to ensure proper functioning. System operates as intended. Marked complete in JJM-IMIS.
(4). Physically Completed : Entire water supply system (civil, electrical, mechanical works) is fully completed, operational, and ready for commissioning. Approved by the State Authority. Marked complete in IMIS.
(5). Scheme Commissioned: Water supply system is fully operational, meets design specifications, and performance standards. Ready for handover. Marked complete in JJM-IMIS with the commissioning date entered in IMIS.
(6). Financially Completed: All financial obligations related to the project are fulfilled. Marked complete in IMIS.
(7). # Only ongoing and completed JJM PWS schemes are counted here:.



×
Report header
Column description :