JJM PWS Scheme analysis as per different stages of work
Format PM-18
SNo State/ UT Total Schemes# Number of schemes
Physically completed Scheme commissioned Financially completed Scheme not physically completed
Total Civil work not yet completed Civil work completed but awaiting electrification Civil work and electrification completed, but trial run pending Civil work, electrification, and trial run completed
A B C D (Out Of C) E (Out Of C) F= (G + H + I + J) G H I J
Total 638550 406167 257692 115719 232383 196111 7385 13961 14926
1 Andaman & Nicobar Islands 40 25 24 24 15 10 0 4 1
2 Andhra Pradesh 76068 20637 8246 2507 55431 53458 106 879 988
3 Arunachal Pradesh 7152 6697 5290 5249 455 237 0 207 11
4 Assam 96006 82224 73127 29305 13782 12390 127 970 295
5 Bihar 304 302 300 301 2 2 0 0 0
6 Chhattisgarh 32215 15851 5903 122 16364 15131 311 187 735
7 Goa 256 256 244 243 0 0 0 0 0
8 Gujarat 585 371 319 308 214 50 2 161 1
9 Haryana 6558 6194 5303 3687 364 345 5 12 2
10 Himachal Pradesh 1747 1137 821 808 610 436 17 120 37
11 Jammu & Kashmir 3361 1474 732 20 1887 1454 58 366 9
12 Jharkhand 97535 67700 33037 2672 29835 28922 75 266 572
13 Karnataka 66318 47053 29634 25323 19265 11433 786 2133 4913
14 Kerala 1730 426 126 44 1304 1069 9 207 19
15 Ladakh 414 364 277 57 50 44 1 4 1
16 Lakshadweep 10 4 0 0 6 5 0 1 0
17 Madhya Pradesh 45111 33094 16672 3312 12017 9449 1297 959 312
18 Maharashtra 51558 25476 12511 7073 26082 17701 1510 3571 3300
19 Manipur 1266 548 67 61 718 434 5 236 43
20 Meghalaya 7790 6228 2511 1687 1562 798 49 593 122
21 Mizoram 852 852 768 478 0 0 0 0 0
22 Nagaland 1408 1194 966 873 214 135 9 36 34
23 Odisha 15377 9653 7944 4835 5724 4824 129 112 659
24 Puducherry 91 26 0 0 65 65 0 0 0
25 Punjab 2307 2216 2111 1989 91 75 0 3 13
26 Rajasthan 11621 4887 2689 1644 6734 4274 1441 589 430
27 Sikkim 1791 1187 359 58 604 48 0 525 31
28 Tamil Nadu 21432 21340 18364 12666 92 82 2 4 4
29 Tripura 19637 12381 11457 2727 7256 6301 204 114 637
30 Uttar Pradesh 40955 19650 8351 419 21305 17472 1226 987 1620
31 Uttarakhand 16555 15588 9066 6660 967 521 2 422 22
32 West Bengal 10500 1132 473 567 9368 8946 14 293 115
Total 638550 406167 257692 115719 232383 196111 7385 13961 14926
Note :
(1). Civil Work Completed: All structural components (intake structures, pump houses, treatment plants, service reservoirs, pipelines, etc.) are constructed and ready for equipment installation. Marked complete in JJM-IMIS.
(2). Electrified: Electrical infrastructure (power supply system, wiring, electrical panels) is installed for operating pumps, motors, and other components. Marked complete in JJM-IMIS. Not required for gravity-based schemes.
(3). Trial Run Completed: All equipment and machinery installed, and a trial run conducted to ensure proper functioning. System operates as intended. Marked complete in JJM-IMIS.
(4). Physically Completed : Entire water supply system (civil, electrical, mechanical works) is fully completed, operational, and ready for commissioning. Approved by the State Authority. Marked complete in IMIS.
(5). Scheme Commissioned: Water supply system is fully operational, meets design specifications, and performance standards. Ready for handover. Marked complete in JJM-IMIS with the commissioning date entered in IMIS.
(6). Financially Completed: All financial obligations related to the project are fulfilled. Marked complete in IMIS.
(7). # Only ongoing and completed JJM PWS schemes are counted here:.



×
Report header
Column description :