JJM PWS Scheme analysis as per different stages of work
Format PM-18
SNo State/ UT Total Schemes# Number of schemes
Physically completed Scheme commissioned Financially completed Scheme not physically completed
Total Civil work not yet completed Civil work completed but awaiting electrification Civil work and electrification completed, but trial run pending Civil work, electrification, and trial run completed
A B C D (Out Of C) E (Out Of C) F= (G + H + I + J) G H I J
Total 638550 350934 213724 86521 287616 241840 6934 14985 23857
1 Andaman & Nicobar Islands 40 25 24 24 15 11 0 4 0
2 Andhra Pradesh 76068 14412 7445 1200 61656 55773 117 906 4860
3 Arunachal Pradesh 7152 6626 5044 4727 526 294 0 220 12
4 Assam 96006 80878 71747 27161 15128 13305 116 1009 698
5 Bihar 304 302 300 301 2 2 0 0 0
6 Chhattisgarh 32215 10970 4468 122 21245 18059 368 194 2624
7 Goa 256 256 244 243 0 0 0 0 0
8 Gujarat 585 371 318 305 214 51 2 161 0
9 Haryana 6558 5965 5061 3495 593 538 5 21 29
10 Himachal Pradesh 1747 1068 714 650 679 541 10 112 16
11 Jammu & Kashmir 3361 1294 732 20 2067 1886 17 154 10
12 Jharkhand 97535 60271 26835 952 37264 36356 62 258 588
13 Karnataka 66318 24888 16475 9325 41430 30579 1025 2906 6920
14 Kerala 1730 270 126 43 1460 1227 9 212 12
15 Ladakh 414 265 241 0 149 143 0 6 0
16 Lakshadweep 10 4 0 0 6 5 0 1 0
17 Madhya Pradesh 45111 30769 15240 3266 14342 11212 1518 1278 334
18 Maharashtra 51558 24805 11677 6290 26753 18312 1499 3735 3207
19 Manipur 1266 519 13 15 747 459 5 242 41
20 Meghalaya 7790 4190 1082 476 3600 2289 61 629 621
21 Mizoram 852 845 694 474 7 5 0 2 0
22 Nagaland 1408 989 857 841 419 163 18 41 197
23 Odisha 15377 8561 6821 1792 6816 5928 166 166 556
24 Puducherry 91 26 0 0 65 65 0 0 0
25 Punjab 2307 2202 2087 1910 105 91 3 4 7
26 Rajasthan 11621 3288 2112 1017 8333 7583 205 259 286
27 Sikkim 1791 1187 354 58 604 48 0 527 29
28 Tamil Nadu 21432 20621 15932 12148 811 633 72 23 83
29 Tripura 19637 9849 6147 2463 9788 8374 351 157 906
30 Uttar Pradesh 40955 18708 1543 227 22247 18247 1288 1024 1688
31 Uttarakhand 16555 15528 9016 6607 1027 569 2 439 17
32 West Bengal 10500 982 375 369 9518 9092 15 295 116
Total 638550 350934 213724 86521 287616 241840 6934 14985 23857
Note :
(1). Civil Work Completed: All structural components (intake structures, pump houses, treatment plants, service reservoirs, pipelines, etc.) are constructed and ready for equipment installation. Marked complete in JJM-IMIS.
(2). Electrified: Electrical infrastructure (power supply system, wiring, electrical panels) is installed for operating pumps, motors, and other components. Marked complete in JJM-IMIS. Not required for gravity-based schemes.
(3). Trial Run Completed: All equipment and machinery installed, and a trial run conducted to ensure proper functioning. System operates as intended. Marked complete in JJM-IMIS.
(4). Physically Completed : Entire water supply system (civil, electrical, mechanical works) is fully completed, operational, and ready for commissioning. Approved by the State Authority. Marked complete in IMIS.
(5). Scheme Commissioned: Water supply system is fully operational, meets design specifications, and performance standards. Ready for handover. Marked complete in JJM-IMIS with the commissioning date entered in IMIS.
(6). Financially Completed: All financial obligations related to the project are fulfilled. Marked complete in IMIS.
(7). # Only ongoing and completed JJM PWS schemes are counted here:.



×
Report header
Column description :