JJM PWS Scheme analysis as per different stages of work
Format PM-18
SNo State/ UT Total Schemes# Number of schemes
Physically completed Scheme commissioned Financially completed Scheme not physically completed
Total Civil work not yet completed Civil work completed but awaiting electrification Civil work and electrification completed, but trial run pending Civil work, electrification, and trial run completed
A B C D (Out Of C) E (Out Of C) F= (G + H + I + J) G H I J
Total 638550 325564 204526 86038 312986 274383 5753 14912 17938
1 Andaman & Nicobar Islands 40 25 24 24 15 11 0 4 0
2 Andhra Pradesh 76068 14412 7425 1199 61656 59658 4 365 1629
3 Arunachal Pradesh 7152 6626 5044 4727 526 294 0 220 12
4 Assam 96006 80089 71317 27161 15917 14097 92 1091 637
5 Bihar 304 302 300 301 2 2 0 0 0
6 Chhattisgarh 32215 10167 4051 122 22048 21512 36 188 312
7 Goa 256 256 244 243 0 0 0 0 0
8 Gujarat 585 349 268 161 236 53 2 180 1
9 Haryana 6558 5965 5061 3495 593 538 5 21 29
10 Himachal Pradesh 1747 1068 714 650 679 541 10 112 16
11 Jammu & Kashmir 3361 1247 733 20 2114 1997 2 80 35
12 Jharkhand 97535 56387 22528 951 41148 40212 63 258 615
13 Karnataka 66318 24888 15974 9325 41430 32100 556 2823 5951
14 Kerala 1730 270 126 43 1460 1229 9 211 11
15 Ladakh 414 265 241 0 149 143 0 6 0
16 Lakshadweep 10 4 0 0 6 5 0 1 0
17 Madhya Pradesh 45111 24983 13975 3263 20128 17187 1193 1391 357
18 Maharashtra 51558 23686 10052 6284 27872 19422 1529 3873 3048
19 Manipur 1266 519 13 15 747 459 5 242 41
20 Meghalaya 7790 3939 1057 445 3851 3032 32 651 136
21 Mizoram 852 842 694 474 10 5 0 2 3
22 Nagaland 1408 945 857 840 463 174 17 46 226
23 Odisha 15377 8468 6788 1630 6909 6123 175 169 442
24 Puducherry 91 26 0 0 65 65 0 0 0
25 Punjab 2307 2200 2079 1863 107 95 4 4 4
26 Rajasthan 11621 3076 2068 1007 8545 8004 143 259 139
27 Sikkim 1791 1187 354 58 604 48 0 527 29
28 Tamil Nadu 21432 16924 15909 12148 4508 4473 4 23 8
29 Tripura 19637 9599 6147 2463 10038 8771 321 151 795
30 Uttar Pradesh 40955 10407 1119 226 30548 24426 1534 1261 3327
31 Uttarakhand 16555 15473 9000 6591 1082 596 2 464 20
32 West Bengal 10500 970 364 309 9530 9111 15 289 115
Total 638550 325564 204526 86038 312986 274383 5753 14912 17938
Note :
(1). Civil Work Completed: All structural components (intake structures, pump houses, treatment plants, service reservoirs, pipelines, etc.) are constructed and ready for equipment installation. Marked complete in JJM-IMIS.
(2). Electrified: Electrical infrastructure (power supply system, wiring, electrical panels) is installed for operating pumps, motors, and other components. Marked complete in JJM-IMIS. Not required for gravity-based schemes.
(3). Trial Run Completed: All equipment and machinery installed, and a trial run conducted to ensure proper functioning. System operates as intended. Marked complete in JJM-IMIS.
(4). Physically Completed : Entire water supply system (civil, electrical, mechanical works) is fully completed, operational, and ready for commissioning. Approved by the State Authority. Marked complete in IMIS.
(5). Scheme Commissioned: Water supply system is fully operational, meets design specifications, and performance standards. Ready for handover. Marked complete in JJM-IMIS with the commissioning date entered in IMIS.
(6). Financially Completed: All financial obligations related to the project are fulfilled. Marked complete in IMIS.
(7). # Only ongoing and completed JJM PWS schemes are counted here:.



×